DERİNER DAM ROADS


                                           The  Construction  of  Deriner  Dam  state  roads  of  ARTVİN-ERZURUM,  ARTVİN-ARDAHAN,
                                           ARTVİN-ARDANUÇ Project has been awarded by 26th Regional Directorate of State Hydraulic
                                           Works, commenced in 2010 and completed in 2013.Within Artvin province, under the scope of
                                           34  km  long Artvin-Erzurum, Artvin-Ardahan, Artvin-Ardanuç  state  roads almost 3.000.000  m3
                                           earthworks,350.000 m3 structural excavation 450.000 m3 reinforced concrete,30.000 m3 rock
                                           fill, wall and hard core, 60.000 m3 plant mix sub-base, 80.000 m3 plant mix base,350 acres of
                                           surface dressing , 40.000 tons of bituminous hot mix asphalt,7 pcs of Tunnel,7 units of Bridge and
                                              17 km long guardrail installation have been performed by joint venture of STY+SİSTEM İş.