DERİNER DAM ROADS
The Construction of Deriner Dam state roads of ARTVİN-ERZURUM, ARTVİN-ARDAHAN,
ARTVİN-ARDANUÇ Project has been awarded by 26th Regional Directorate of State Hydraulic
Works, commenced in 2010 and completed in 2013.Within Artvin province, under the scope of
34 km long Artvin-Erzurum, Artvin-Ardahan, Artvin-Ardanuç state roads almost 3.000.000 m3
earthworks,350.000 m3 structural excavation 450.000 m3 reinforced concrete,30.000 m3 rock
fill, wall and hard core, 60.000 m3 plant mix sub-base, 80.000 m3 plant mix base,350 acres of
surface dressing , 40.000 tons of bituminous hot mix asphalt,7 pcs of Tunnel,7 units of Bridge and
17 km long guardrail installation have been performed by joint venture of STY+SİSTEM İş.