DODURGA 1 AND 2

                                                                                                                   HYDRO ELECTRİCAL POWER PLANT

                                                                                                              The HEPP-1 ,HEPP-2 are  located  in Dodurga  village of
                                                                                                              Acıpayam town in Denizli and is 20 km far to Acıyapam town.
                                                                                                              The  project, a channel  type HEPP, consists  of HEPP-1,-
                                                                                                              HEPP-2,regulator, water delivery channel  HEPP-1,penstock
                                                                                                              pipes, power station building ,discharge channel  and
                                                                                                              pumped-storage. The Source of project is the Erceöz River
                                                                                                              at the West Mediterranean 40  km2 Basin.  The  installed
                                                                                                              power of HEPP-1 is 2X1031 kW. The installed power HEPP-2
                                                                                                              is 2X1038 kW. The Total İnstalled power becomes 4,14 MW
                                                                                                                  while it is generating 12,31 Gwh electricity annually.