Page 18 - STY İNŞAAT KATALOG TASARIMI
P. 18
DODURGA 1 AND 2
HYDRO ELECTRİCAL POWER PLANT
The HEPP-1 ,HEPP-2 are located in Dodurga village of
Acıpayam town in Denizli and is 20 km far to Acıyapam town.
The project, a channel type HEPP, consists of HEPP-1,-
HEPP-2,regulator, water delivery channel HEPP-1,penstock
pipes, power station building ,discharge channel and
pumped-storage. The Source of project is the Erceöz River
at the West Mediterranean 40 km2 Basin. The installed
power of HEPP-1 is 2X1031 kW. The installed power HEPP-2
is 2X1038 kW. The Total İnstalled power becomes 4,14 MW
while it is generating 12,31 Gwh electricity annually.