Page 22 - STY İNŞAAT KATALOG TASARIMI
P. 22

ÇINARCIK DAM


              The project has commissioned in 2008 as it is aimed for the
              energy, irrigation, flood protection and potable water supply
              on the Orhaneli stream in Orhaneli district of Bursa.The proje-
              ct  has  been  undertaken  by  joint  venture  of  YAYLA+TİM-
              TAŞ+STY. The technical definition of Project is; the height of
              body from river bed: 210m, the volume of upstream basin:
              372,940 hm3, the area of upstream basin: 10,14 km2, the
              type of body is: rock fill, installed power: 120 MW, Annual
              electricity production: 422,60 GWh and the annual supply
              of potable water: 145 hm3
   17   18   19   20   21   22   23   24   25   26   27