Page 22 - STY İNŞAAT KATALOG TASARIMI
P. 22
ÇINARCIK DAM
The project has commissioned in 2008 as it is aimed for the
energy, irrigation, flood protection and potable water supply
on the Orhaneli stream in Orhaneli district of Bursa.The proje-
ct has been undertaken by joint venture of YAYLA+TİM-
TAŞ+STY. The technical definition of Project is; the height of
body from river bed: 210m, the volume of upstream basin:
372,940 hm3, the area of upstream basin: 10,14 km2, the
type of body is: rock fill, installed power: 120 MW, Annual
electricity production: 422,60 GWh and the annual supply
of potable water: 145 hm3