Page 17 - STY İNŞAAT KATALOG TASARIMI
P. 17
YEŞİL HYDRO ELECTRİCAL POWER PLANT
It is located at the Yeşilırmak basin in Sivas province in the Central
Anatolian Region. The annual avarage flow rate at the regulator is 3,89
m3/s and the regulator is on the 1431.00m high from river bed. It is plan-
ned to generate average 56,16 million kWh annually with 14 MW instal-
led power and has been completed by the Joint venture of HGG+ STY.