ÇİFTE KÖPRÜ HES


                                                                                                It is located at the in Düzköy village of Artvin province and it is 8 km far to
                                                                                                Borçka Town of Artvin. The project, a channel type HEPP, consists of regulator,
                                                                                                2385 long water delivery channel,235 m long penstock pipes, power station
                                                                                                building ,discharge channel and pumped-storage. It is planned to generate
                                                                                                average  31,85  31,85  GWh annually  with 7,77  MWe  installed power.The
                                                                                                    project has commenced in 2010 and completed on April of 2013,