Page 19 - STY İNŞAAT KATALOG TASARIMI
P. 19
KIRŞEHİR-SAVCILI INTERSECTION -SARIYAHŞİ HIGHWAY
It is awarded by the 3th Regional Directorate of the General Directorate of Highways and com-
menced in late of 2011. The project is the unique and differs from other Highways because of
the execution method of road such that; the road has linked to the bridge located at the Hirfanlı
Dam Upstream and the filling of the road has been performed by 180,000meter Geosynthetics
Piling in order to strengthen bearing capacity of road base.