MOTORWAY OF KURTKÖY
INTERSECTION- (SULTANÇİFTLİĞİ – ŞİLE)
INTERSECTION DUAL CARRIAGEWAY
High standard road transportation will be provided
between the existing TEM Highway and the Nort-
hern Marmara Motorway when the total length of
the road is 16.5 km and the project is completed as
bituminous hot mix asphalt coating. The employer is
the Regional Directorate of State Highways Admi-
nistration 1. Within the scope of the project, which
started to be built at the end of 2010, 1.000.000
m3 soil work, 60.000 m3 artificial structure excavati-
on, 50.000 m3 concrete production, 45.000 m3
stone filling, wall and blockage, 220.000 tons plent-
mics subbase, 210.000 tons plentmix foundation,
270.000 tons bituminous hot mix, 4 bridges and 40
km guardrail productions.