TURHAL DAM CONSTRUCTION


                                                                              It is awarded by General Directorate of Electricity Production Inc. and completed between
                                                                              17/07/2002- 04/08/2010.The environmental project covers the transfer of cinder coming
                                                                              from burned solid fuel at Thermic plant via special pipes with water to the upstream basin
                                                                              of proposed dam and so that enables re-use of that water. The type of dam to be constru-
                                                                              cted for the environmental purpose, is the clay core rock fill and under the scope of the
                                                                              dam, access tunnel, sluice outlet, 1080m long 1st level of main force line, 5697 m long 2nd
                                                                              level of main force line, valve chamber, steel pipes, steel structures of bridge, commissioning,
                                                                              provision material and access road works have been performed by Joint venture of YAY-
                                                                                                    LA-TİMTAŞ-CEYLAN-STY(sharing %25).