All for Joomla All for Webmasters

GELİBOLU-ECEABAT DUAL CARRIAGEWAY

GELİBOLU-ECEABAT DUAL CARRIAGEWAY

It is awarded by the 1st Regional Directorate of the General Directorate of Highways, constructions of approximately 48 km total length Gelibolu-Eceabat highway, which is located within the provincial boundaries of Çanakkale, 14 km long segment of the project is located within the boundaries of Gelibolu National Park. Upon completion of this project, transportation standards of Gelibolu and Eceabat will be improved. Scope of project is bituminous hot-mix coating, 3.250.000 m³ earth works, 330.000 m³ structural excavations, 160.000 m³ reinforced concrete, 150.000 m³ rock fill, wall and hard core, 50.000 m² Geogrid Reinforced Earth Wall, 560.000 tons of plant mix sub-base, 540.000 tons plant mix base, 530.000 tons bituminous hot mix, constructions of 5 bridges, 19 interchange and 4 underpasses.

Gelibolu - Eceabat Bölünmüş Yolu

GELİBOLU – ECEABAT KM:149+800 – 197+250 ARASI KESİMDE BÖLÜNMÜŞ YOL YAPIM İŞİ Çanakkale il sınırları içerisinde, toplam uzunluğu 48 km olan ve bitümlü sıcak karışım asfalt kaplama olarak projelendirilmiş bölünmüş yolun 14 km lik kesimi Gelibolu Yarımadası Tarihi Milli Parkı sınırları içerisinde yer almaktadır. Proje tamamlandığında Gelibolu-Eceabat arasında yüksek standartlı karayolu ulaşımı sağlanmış olacaktır. İşveren İdare Karayolları 1.Bölge Müdürlüğüdür. Yapımına 2010 yılı sonunda başlanan proje kapsamında takriben; 3.250.000 m3 toprak işi, 330.000 m3 sanat yapısı kazısı, 160.000 m3 beton imalatı, 150.000 m3 taş dolgu, duvar ve blokaj, 50.000 m2 lik blok kaplamalı geosentetik donatılı duvar imalatı, 560.000 ton plentmiks alttemel, 540.000 ton plentmiks temel, 530.000 ton bitümlü sıcak karışım kaplama, 5 adet köprü, 19 adet kavşak ve 4 adet alt geçit imalatları bulunmaktadır.