All for Joomla All for Webmasters

DERİNER DAM ROADS

DERİNER DAM ROADS

The Construction of Deriner Dam state roads of ARTVİN-ERZURUM, ARTVİN-ARDAHAN, ARTVİN-ARDANUÇ Project has been awarded by 26th Regional Directorate of State Hydraulic Works, commenced in 2010 and completed in 2013.Within Artvin province, under the scope of 34 km long Artvin-Erzurum, Artvin-Ardahan, Artvin-Ardanuç state roads almost 3.000.000 m3 earthworks,350.000 m3 structural excavation 450.000 m3 reinforced concrete,30.000 m3 rock fill, wall and hard core, 60.000 m3 plant mix sub-base, 80.000 m3 plant mix base,350 acres of surface dressing , 40.000 tons of bituminous hot mix asphalt,7 pcs of Tunnel,7 units of Bridge and 17 km long guardrail installation have been performed by joint venture of STY+SİSTEM İş.

Deriner Barajı Yolları

DERİNER BARAJI ARTVİN-ERZURUM, ARTVİN-ARDAHAN, ARTVİN-ARDANUÇ DEVLET YOLLARI YAPIM İNŞAATI DSİ 26. Bölge Müdürlüğü sınırları içerisinde yer alan projenin yapımına 2010 yılında başlanmış ve 2013 yılında tamamlanmıştır. Artvin il sınırları içerisindeki takriben 34 km’lik Artvin-Erzurum, Artvin-Ardahan, Artvin-Ardanuç devlet yollarının yapımı kapsamında 3.000.000 m3 toprak işi, 350.000 m3 sanat yapısı kazısı, 450.000 m3 beton imalatı, 30.000 m3 taş dolgu, duvar ve blokaj, 60.000 m3 alttemel, 80.000 m3 temel, 350 dekar sathi kaplama, 40.000 ton bitümlü sıcak karışım, 7 adet tünel, 7 adet köprü ve 17 km otokorkuluk imalatları bulunmaktadır. Proje STY+SİSTEM İş Ortaklığı yükleniminde tamamlanmıştır.